Water and sewer capacity and septic approval: what land needs
A rezoning or plat means little if the land cannot get water and sewer or pass a septic review. Utility approval is often the step that decides how many lots a parcel can hold. Here is how it works.
Part of our land entitlements guide: rezoning, subdivision, site plans, variances, use permits, annexation and utility approvals, and how each affects a sale.
Why utilities decide land value
Lot count often depends on sewer. With public sewer, lots can be smaller. With septic, each lot needs enough suitable soil, which usually means larger lots. A parcel far from a sewer main may need a costly extension before more lots are possible.
Utility review and capacity fees
Official fees as published. Check the source before filing. Checked Nov 3, 2026.
Steps to get utility approval
The steps below follow the Metro Water Services process:
- Find the utility provider for the parcel. Many areas have more than one.
- Get a fire flow requirement from the Fire Marshal, where the utility asks for it first.
- Submit the availability or capacity request with a site utility plan or plat.
- Pay the review fee and wait for the letter.
- Pay capacity fees and build any required extensions when the project moves ahead.
- Where there is no sewer, apply to the health department for a septic permit.
Who decides?
The utility decides capacity. In Nashville, that is Metro Water Services for most of the county. The health department decides septic. In Madison County, Alabama, that is the Alabama Department of Public Health's Madison County office.
Nashville: Metro Water Services availability
Metro Water Services asks developers to email the availability request form, with a site utility plan or plat, to MWS.DSCapacity@nashville.gov. The form asks for fire flow from the Fire Marshal first. MWS's commercial and multifamily guide says the study takes about 15 working days, and the letter is good for one year.
The MWS fee schedule lists the availability study at $800 plus a 10% technology fee. Capacity fees are $1,375 for water and $2,300 for sewer per 350 gallons per day unit.
In Davidson County, the subdivision rules call for lots on septic to be at least one acre, with Metro Health approval.
Huntsville and Madison County: sewer and septic
Huntsville charges a $1,000 sewer connection fee where the main was installed at no cost to the property. Lots in an approved subdivision are exempt.
The Alabama Department of Public Health's Madison County office requires a permit before a septic system is installed or repaired, and an Approval for Use before the home is occupied.
Typical utility documents
Expect most of these:
- The availability or capacity request form
- A site utility plan or plat
- A fire flow letter
- Soil or perc test results for septic
- Fees
Selling land without utility approval
Liberty Acres buys land anywhere in the US, in any condition, with no agents and no commissions. For larger parcels with development potential, we can sign terms that allow time for zoning and entitlement work, and you keep title until closing. See how we buy land that needs rezoning or the land entitlements guide.
Common questions
How long is a Metro Water capacity letter good for?
Metro Water Services says its availability letter is valid for one year.
How much is a Nashville water and sewer availability study?
The MWS fee schedule lists $800 plus a 10% technology fee, for $880.
How big must a septic lot be in Davidson County?
The Metro subdivision rules call for at least one acre, with Metro Health approval.
Who approves septic in Madison County, Alabama?
The Alabama Department of Public Health's Madison County office. You need a permit before installing and an Approval for Use before occupying.
Sources
- Metro Water Services: Development services
- MWS: Availability request form (Oct. 2026)
- MWS: Development services fee schedule (Mar. 2026)
- MWS: Multifamily and commercial development guide (Apr. 2026)
- Metro Nashville Planning: Subdivision Regulations
- City of Huntsville: Sewer connection permit
- ADPH Madison County: Environmental services
