Nashville & Huntsville Rezoning Report 2026

November 2026 update: Middle Tennessee and North Alabama

An original study of 373 rezoning cases in Metro Nashville-Davidson County and Huntsville, Alabama, built from Planning Commission agendas and City Council records, with U.S. Census Bureau building permit data for context. It shows which requests pass, which stall, and how long a decision takes. Liberty Acres is an Atlanta-based, family-owned land company that buys land in both markets.

Key findings, November 2026

  • 87.9% of rezoning requests with a final result were approved across five cities: Nashville, Franklin, Murfreesboro, Clarksville and Huntsville (376 of 428 decided cases).
  • Clarksville is the outlier. Its City Council approved 67.2% of decided rezonings (41 of 61) and voted down 20, including 12 the Regional Planning Commission had recommended for approval.
  • Nashville almost never votes a rezoning down. None of 272 decided Metro cases failed on a Council vote; the 29 that did not pass were deferred indefinitely (18), withdrawn (8) or stopped at the Planning Commission (3).
  • A Planning Commission deferral is the clearest warning sign in Nashville: cases never deferred passed 95.1% of the time (175 of 184), against 77.3% for cases deferred at least once (68 of 88).
  • Speed varies more than approval. The median approved case took 37 days from Planning Commission to final vote in Clarksville (41 cases) and 82 days in Nashville-Davidson County (243 cases).

Cite as: Liberty Acres, Nashville & Huntsville Rezoning Report 2026 (November 2026 update), libertyacres.land/guides/nashville-huntsville-rezoning-report-2026. Free to reuse under CC BY 4.0.

November 2026 update: five cities

This edition adds Franklin, Murfreesboro and Clarksville from the Rezoning Approval Tracker and updates Nashville's pending bills through the November 5, 2026 Metro Council meeting, where 2 more rezonings were approved. 23 Nashville rezoning bills are still pending at the Council (14 awaiting third reading, 9 awaiting a public hearing).

CityCasesApproved, of decidedNot approvedPendingMedian days to final voteAgendas covered
Nashville-Davidson County, TN32489.3% (243 of 272)295282 (243 cases)Nov 2024 to Oct 2026
Franklin, TN22100% (21 of 21)0161 (21 cases)Oct 2024 to Jun 2026
Murfreesboro, TN2892.9% (26 of 28)2071 (26 cases)Dec 2024 to Feb 2026
Clarksville, TN6467.2% (41 of 61)20337 (41 cases)Jan 2025 to Apr 2026
Huntsville, AL4997.8% (45 of 46)1358 (45 cases)Nov 2024 to Oct 2026
All five48787.9% (376 of 428)5259

Median days run from the Planning Commission's final action to the final vote of the Nashville-Davidson County Metro Council, Franklin Board of Mayor and Aldermen, Murfreesboro City Council, Clarksville City Council, Huntsville City Council, approved cases only. Cities cover different date ranges, so compare rates with their sample sizes. Franklin cases · Murfreesboro cases · Clarksville cases

Why requests fail: what the public record shows

Minutes and agendas record how a request ended far more often than why. Here is how the 52 decided requests that did not pass ended:

CityHow it endedCases
NashvilleDeferred indefinitely18
NashvilleWithdrawn8
NashvillePlanning Commission disapproval, no Council bill3
NashvilleVoted down by the Metro Council0
ClarksvilleVoted down by the City Council20
MurfreesboroDeferred indefinitely1
MurfreesboroDenied after the companion annexation failed1
HuntsvilleWithdrawn1
FranklinNone (every decided case approved)0
  • Clarksville. The City Council followed a Planning Commission approval recommendation 76.5% of the time (39 of 51) and approved 1 of 9 requests the Commission recommended against. 18 of 20 denials came on first reading, 2 on second.
  • Nashville. Requests in trouble tend to be deferred again and again, then deferred indefinitely or withdrawn, rather than voted down. Multifamily (RM) requests had the lowest approval rate of any zoning family (see below).
  • Murfreesboro. The one denial came when the Council failed the companion annexation resolution, so the zoning ordinance never reached a vote. Council deferrals in the minutes cite issues such as drainage.
  • Huntsville and Franklin. No council denials in the window. Huntsville's one non-approval was a withdrawal.

Headline findings

  1. Nashville approved 89.3% of rezoning requests that reached a final result. 243 of 272 decided cases were approved. No rezoning bill in the set failed on a Metro Council floor vote. Requests that did not pass ended another way: 18 were deferred indefinitely, 8 were withdrawn and 3 stopped after a Planning Commission disapproval with no Council bill.
  2. A Planning Commission deferral is the clearest warning sign. Cases the Commission never deferred were approved 95.1% of the time (175 of 184). Cases deferred at least once were approved 77.3% of the time (68 of 88), and 70.6% after three or more deferrals. For approved cases, the median from first agenda to final vote was 131 days with a deferral and 82 days without one.
  3. Specific Plans get deferred far more often, then pass at about the same rate. 55.6% of new Specific Plan (SP) requests were deferred at least once at the Planning Commission, against 11% of base zone changes. Approval rates ended up close: 90.3% for new SPs and 89.2% for base zone changes.
  4. Multifamily requests fail most often in Nashville. Requests for a multifamily (RM) district were approved 76% of the time (19 of 25), the lowest of any zoning family with at least 5 decided cases. Mixed use and office requests were approved 96.8% of the time (30 of 31).
  5. Huntsville decides faster, on much bigger tracts. Huntsville's median was 58 days from the Planning Commission to the final Council vote, against 82 days in Nashville. The median approved Huntsville tract was 19.35 acres, against 1.04 acres in Nashville. 61.2% of Huntsville's cases (30 of 49) zoned land newly annexed into the city. Huntsville approved 45 of 46 decided cases and denied none.
  6. Two council districts carry a quarter of Nashville's rezoning load. District 16 (43 cases) and District 2 (36 cases) together account for 24.4% of the 324 Nashville cases. 33 of Metro's 35 council districts had at least one case.
  7. Nashville is not getting faster. Across 8 quarters with at least 10 approved cases (2025 Q1 to 2026 Q4), the quarterly median from Planning Commission to final vote stayed between 68 and 89 days.
  8. Nashville homebuilding permits keep falling while Madison County holds. Davidson County authorized 5,632 housing units in 2025, 65.5% below its 2021 peak of 16,310, and January to September 2026 ran 26.2% below the same months of 2025. Madison County, Alabama, home to Huntsville, authorized 2,866 single-family homes in 2025 with about 58% of Davidson's population, against 2,739 in Davidson.

Free to reuse under CC BY 4.0. Download the summary CSV · building permits CSV · Nashville cases · Huntsville cases

Nashville vs Huntsville at a glance

MeasureNashville-Davidson CountyHuntsville
Cases tracked32449
Approved, of cases with a final result89.3% (243 of 272)97.8% (45 of 46)
Denied or failed on a Council vote00
Median days, Planning Commission to final vote82 (range 19 to 495)58 (range 30 to 72)
Approved cases decided within 60 days10.7% (26 of 243)55.6% (25 of 45)
Median approved tract1.04 acres19.35 acres
Deferred at least once by the Planning Commission30.6% (99 of 324)Not tracked
Housing units permitted, 2025 (county)5,632 in Davidson4,070 in Madison
Units permitted per 1,000 residents, 20257.69.4
Single-family units per 1,000 residents, 20253.76.6
Units permitted, Jan. to Sep. 2026 vs 20253,162 vs 4,282 (-26.2%)2,761 vs 2,840 (-2.8%)

Rezoning figures cover each city's own cases. Permit figures are county totals (Davidson County is the consolidated Metro government; Huntsville sits mainly in Madison County and extends into Limestone County).

The data in charts

Each chart is built from the same data as the tables and can be downloaded as an SVG or PNG file or embedded with the code under it. Reuse with credit to Liberty Acres under CC BY 4.0.

Rezoning approval rate in five Middle Tennessee and North Alabama cities. Approved cases as a share of cases with a final result, 428 decided cases in total. Sample size for each city is in the label.
Rezoning approval rate by cityFranklin, TN100% (21 of 21)Huntsville, AL97.8% (45 of 46)Murfreesboro, TN92.9% (26 of 28)Nashville-Davidson County, TN89.3% (243 of 272)Clarksville, TN67.2% (41 of 61)Source: Liberty Acres, Middle TN & North AL Rezoning Report, Nov. 2026 (libertyacres.land), CC BY 4.0

Franklin approved every decided case (21 of 21). Murfreesboro approved 26 of 28. Smaller samples move more on one or two votes.

Download this chart: SVG · PNG

Embed this chart

Copy this HTML. It shows the chart with a credit link to Liberty Acres (CC BY 4.0).

Median days from Planning Commission to final vote, five cities. Approved cases only. Calendar days from the Planning Commission's final action to the final council or board vote.
Median days, Planning Commission to final vote (approved cases)Clarksville, TN37 days (41 cases)Huntsville, AL58 days (45 cases)Franklin, TN61 days (21 cases)Murfreesboro, TN71 days (26 cases)Nashville-Davidson County, TN82 days (243 cases)Source: Liberty Acres, Middle TN & North AL Rezoning Report, Nov. 2026 (libertyacres.land), CC BY 4.0

Clarksville's approved cases ranged from 9 to 100 days. Nashville-Davidson County's ranged from 19 to 495 days; Metro Council rezoning bills take three readings, with the public hearing at second reading.

Download this chart: SVG · PNG

Embed this chart

Copy this HTML. It shows the chart with a credit link to Liberty Acres (CC BY 4.0).

How rezoning requests that did not pass ended. Decided cases that were not approved, by city and by how they ended. Nashville requests rarely reach a losing vote; Clarksville's Council votes them down.
How rezoning requests that did not pass endedNashville: Deferred indefinitely18Nashville: Withdrawn8Nashville: Planning Commission disapproval, no Council bill3Nashville: Voted down by the Metro Council0Clarksville: Voted down by the City Council20Murfreesboro: Deferred indefinitely1Murfreesboro: Denied after the companion annexation failed1Huntsville: Withdrawn1Source: Liberty Acres, Middle TN & North AL Rezoning Report, Nov. 2026 (libertyacres.land), CC BY 4.0

Outside Clarksville, only 1 decided case in the other four cities ended in a losing council vote. In Clarksville, 18 of the 20 denials came on first reading.

Download this chart: SVG · PNG

Embed this chart

Copy this HTML. It shows the chart with a credit link to Liberty Acres (CC BY 4.0).

Clarksville City Council result by Planning Commission recommendation. Clarksville rezoning cases with a final Council result, grouped by the Regional Planning Commission's recommendation as printed in the Council minutes.
Clarksville: Council approval rate by Planning Commission recommendationCommission recommended approval76.5% approved (39 of 51)Commission recommended disapproval11.1% approved (1 of 9)Source: Liberty Acres, Middle TN & North AL Rezoning Report, Nov. 2026 (libertyacres.land), CC BY 4.0

11 of Clarksville's 20 Council denials had a staff recommendation of approval. 3 cases have no final result in the posted minutes and are left out.

Download this chart: SVG · PNG

Embed this chart

Copy this HTML. It shows the chart with a credit link to Liberty Acres (CC BY 4.0).

Approval rate by type of zoning change. Approved cases as a share of cases with a final result. Nashville: 324 cases, Huntsville: 49 cases. Groups with at least 5 decided cases.
Approval rate by type of zoning changeNashville: Base zone change89.2% (132 of 148)Nashville: New Specific Plan (SP)90.3% (84 of 93)Nashville: Specific Plan amendment92% (23 of 25)Nashville: Urban Design Overlay66.7% (4 of 6)Huntsville: Zoning newly annexed land96.7% (29 of 30)Huntsville: Rezoning land already in a city district100% (14 of 14)Source: Liberty Acres, Nashville & Huntsville Rezoning Report 2026 (libertyacres.land), CC BY 4.0

Huntsville approved at least 96.7% of decided cases in both of its main case types. In Nashville, base zone changes, new SPs and SP amendments all landed within a few points of each other. Urban Design Overlay cases are too few (6 decided) to chart.

Download this chart: SVG · PNG

Embed this chart

Copy this HTML. It shows the chart with a credit link to Liberty Acres (CC BY 4.0).

Nashville approval rate by Planning Commission deferrals. Cases the Metro Planning Commission deferred at least once were approved less often. Deferral counts come from the action agendas.
Nashville approval rate by Planning Commission deferralsNever deferred95.1% (175 of 184)Deferred at least once77.3% (68 of 88)Deferred three or more times70.6% (24 of 34)Source: Liberty Acres, Nashville & Huntsville Rezoning Report 2026 (libertyacres.land), CC BY 4.0

99 of 324 Nashville cases (30.6%) were deferred at least once at the Planning Commission. Deferral also adds time: approved cases that were deferred took a median of 131 days from first agenda to final vote (68 cases), against 82 days for those never deferred (175 cases).

Download this chart: SVG · PNG

Embed this chart

Copy this HTML. It shows the chart with a credit link to Liberty Acres (CC BY 4.0).

Nashville approval rate by requested zoning. Grouped by the family of the zoning district requested, per Metro's zoning classifications. Groups with at least 5 decided cases, lowest first.
Nashville approval rate by requested zoningMultifamily (RM)76% (19 of 25)Commercial (CS, CL)80% (4 of 5)Single-family (RS, AR)87.5% (7 of 8)Industrial (IWD, IR, IG)88.9% (8 of 9)Specific Plan (new or amended)90.7% (107 of 118)One and two-family (R)91.3% (63 of 69)Mixed use and office (MU, OR)96.8% (30 of 31)Source: Liberty Acres, Nashville & Huntsville Rezoning Report 2026 (libertyacres.land), CC BY 4.0

Of the 25 decided multifamily (RM) requests, 6 were not approved: 5 deferred indefinitely, 1 stopped after a Planning Commission disapproval.

Download this chart: SVG · PNG

Embed this chart

Copy this HTML. It shows the chart with a credit link to Liberty Acres (CC BY 4.0).

Median days from Planning Commission to final Council vote, by quarter. Approved cases, grouped by the quarter of the final Council vote. Quarters with fewer than 10 Nashville cases are left out.
Median days, Planning Commission to final Council voteNashville-Davidson CountyHuntsville82652025 Q182582025 Q289652025 Q382372025 Q489652026 Q168582026 Q282582026 Q376582026 Q4Median days, approved cases, by quarter of the final voteSource: Liberty Acres, Nashville & Huntsville Rezoning Report 2026 (libertyacres.land), CC BY 4.0

Huntsville's quarterly medians are based on smaller counts (shown in the CSV) and sit below Nashville's in every quarter where both have cases.

Download this chart: SVG · PNG

Embed this chart

Copy this HTML. It shows the chart with a credit link to Liberty Acres (CC BY 4.0).

Nashville rezoning cases by Metro Council district (top 10). Cases on Planning Commission agendas by council district, with the approval rate among decided cases. 33 of Metro's 35 districts had at least one case.
Nashville rezoning cases by Metro Council district (top 10)District 1643 cases, 94.6% approved (35 of 37)District 236 cases, 93.9% approved (31 of 33)District 528 cases, 89.5% approved (17 of 19)District 125 cases, 80% approved (12 of 15)District 2118 cases, 92.9% approved (13 of 14)District 1715 cases, 100% approved (14 of 14)District 814 cases, 100% approved (11 of 11)District 914 cases, 85.7% approved (12 of 14)District 1914 cases, 85.7% approved (12 of 14)District 710 cases, 90% approved (9 of 10)Source: Liberty Acres, Nashville & Huntsville Rezoning Report 2026 (libertyacres.land), CC BY 4.0

District numbers are Metro Council districts as listed on the Planning Commission agendas.

Download this chart: SVG · PNG

Embed this chart

Copy this HTML. It shows the chart with a credit link to Liberty Acres (CC BY 4.0).

Housing units authorized by building permits, Davidson County TN and Madison County AL. All housing units in new privately owned residential buildings, 2019 to 2025, from the U.S. Census Bureau Building Permits Survey.
Housing units authorized by building permitsDavidson County, TNMadison County, AL9,9153,283201913,3243,918202016,3105,541202115,2853,187202211,2255,44920236,8804,71020245,6324,0702025Units per year, U.S. Census Bureau Building Permits Survey (estimates)Source: Liberty Acres, Nashville & Huntsville Rezoning Report 2026 (libertyacres.land), CC BY 4.0

Davidson County's 2021 peak was driven by buildings with 5 or more units. Madison County's totals are mostly single-family homes.

Download this chart: SVG · PNG

Embed this chart

Copy this HTML. It shows the chart with a credit link to Liberty Acres (CC BY 4.0).

Approval by type of zoning change

Market and typeCasesApprovedRateMedian days
Nashville: Base zone change182132 of 14889.2%82
Nashville: New Specific Plan (SP)10884 of 9390.3%82
Nashville: Specific Plan amendment2723 of 2592%82
Nashville: Urban Design Overlay74 of 666.7%51
Huntsville: Zoning newly annexed land3029 of 3096.7%58
Huntsville: Rezoning land already in a city district1714 of 14100%58

Which rezoning requests fail most in Nashville

Grouped by the zoning district requested. Not approved means deferred indefinitely, withdrawn or stopped after a Planning Commission disapproval.

Requested zoningDecidedApprovedRateNot approved
Multifamily (RM)251976%6
Commercial (CS, CL)5480%1
Single-family (RS, AR)8787.5%1
Industrial (IWD, IR, IG)9888.9%1
Specific Plan (new or amended)11810790.7%11
One and two-family (R)696391.3%6
Mixed use and office (MU, OR)313096.8%1

By tract size, the approval rate was 90% for under 1 acre (117 of 130), 91.1% for 1 to 5 acres (51 of 56), 85.2% for 5 to 20 acres (46 of 54) and 90% for 20 acres or more (27 of 30).

Deferral rates

Planning Commission deferralsCasesApprovedRateDeferred indefinitely
Never deferred225175 of 18495.1%4
Deferred at least once9968 of 8877.3%14
Deferred three or more times3724 of 3470.6%8

Deferral rate by quarter of the Planning Commission's final action:

QuarterCasesDeferred at least onceShare
2024 Q423313%
2025 Q1401435%
2025 Q2582339.7%
2025 Q3321031.3%
2025 Q433721.2%
2026 Q134617.6%
2026 Q2331030.3%
2026 Q342716.7%
2026 Q410110%

Approval by Metro Council district

Districts with at least 10 cases. Every district is in the CSV.

DistrictCasesApprovedRateMedian days
District 164335 of 3794.6%82
District 23631 of 3393.9%82
District 52817 of 1989.5%82
District 12512 of 1580%110
District 211813 of 1492.9%82
District 171514 of 14100%82
District 81411 of 11100%110
District 91412 of 1485.7%89
District 191412 of 1485.7%68
District 7109 of 1090%82
District 32106 of 966.7%55
District 33105 of 771.4%96

Time to decision by quarter

Quarter of final voteNashville median daysNashville casesHuntsville median daysHuntsville cases
2024 Q43320
2025 Q18223655
2025 Q28227585
2025 Q38951658
2025 Q48226374
2026 Q18938657
2026 Q26821585
2026 Q38239587
2026 Q47616584

Quarters with few cases, including the partial current quarter, swing on a handful of votes. Read them with the counts.

Editions

  • November 2026 (updated November 10, 2026): adds Franklin, Murfreesboro and Clarksville; Nashville pending bills checked in Legistar through the November 5, 2026 Council meeting; how not-approved requests ended; embeddable charts.
  • First edition (November 3, 2026): Nashville and Huntsville rezoning outcomes, deferrals, timelines and building permits.

The report is updated monthly on this page.

Methodology

  • Nashville cases. Every zone change (Z), Specific Plan (SP) and Urban Design Overlay (UD) case on the posted Metro Planning Commission action agendas from November 14, 2024 to October 22, 2026, matched to its Metro Council bill through the public Legistar API. Building-material companion bills are excluded. This is the same data as the Rezoning Approval Tracker.
  • Franklin, Murfreesboro and Clarksville cases. Zoning and rezoning cases from Planning Commission minutes followed to the final vote of the Franklin Board of Mayor and Aldermen (Oct 2024 to Jun 2026 agendas), the Murfreesboro City Council (Dec 2024 to Feb 2026) and the Clarksville City Council (Jan 2025 to Apr 2026), as listed in the Rezoning Approval Tracker. Clarksville recommendations are as printed in the Council minutes; 3 Clarksville cases with no final result in posted minutes are left out of rates.
  • Huntsville cases. Every zoning and rezoning case on Huntsville Planning Commission agendas from November 19, 2024 to October 27, 2026, followed to the City Council's final action in Legistar.
  • Approval rate. Approved cases divided by cases with a final result (approved, denied, withdrawn or deferred indefinitely). Pending cases are left out of rates.
  • Days to decision. Calendar days from the Planning Commission's final action to the Council's final vote, approved cases only. Medians of an even count are rounded to the nearest day.
  • Deferrals. The number of times a case was deferred at the Planning Commission, read from the action agendas. Council deferrals are tracked separately in the case CSV.
  • Requested zoning. Nashville cases grouped by the family of the district requested, per Metro's zoning classifications. Groups with fewer than 5 decided cases are not shown, and Urban Design Overlays appear only under type of change because they are overlays, not base districts.
  • Quarters. Time to decision is grouped by the quarter of the final Council vote. Deferral rates are grouped by the quarter of the Planning Commission's final action.
  • Building permits. Housing units authorized in new privately owned residential buildings, from the U.S. Census Bureau Building Permits Survey county files (annual 2019 to 2025, and year-to-date through September for 2025 and 2026), per 1,000 residents using the Vintage 2025 county population estimates. Retrieved November 3, 2026.

Limits

  • Three Nashville Planning Commission action agendas in the window were not posted, so cases heard only on those dates may be missing.
  • 24 Nashville cases have a Planning Commission action but no Council bill found in Legistar yet. They count as pending.
  • Groups with few cases (for example Urban Design Overlays, single districts or recent quarters) can move several points on one or two votes.
  • Franklin (21 decided), Murfreesboro (28) and Clarksville (61) are small samples with different date ranges from Nashville and Huntsville.
  • Public records rarely state why a council voted a request down, so the report groups not-approved cases by how they ended, not by reason.
  • Huntsville denied no rezoning in the window, so the study cannot say which Huntsville requests fail most. Huntsville deferrals were not tracked.
  • The study shows patterns, not causes. A deferral often signals open issues with neighbors, staff or design, and those issues, not the deferral itself, may drive the outcome.
  • Census permit counts are estimates that include imputation for non-reporting places, and they cover whole counties rather than city limits.
  • The report covers totals and groups only and does not single out any property, owner or applicant.

Reuse and citation

The data, tables and charts are licensed Creative Commons Attribution 4.0 (CC BY 4.0). Reuse them in any medium with credit and a link: Source: Liberty Acres, Nashville & Huntsville Rezoning Report 2026, libertyacres.land/guides/nashville-huntsville-rezoning-report-2026. Reporters with questions about the data can reach Spencer Cox through the author page.

Questions about the report

What share of rezoning requests get approved in Nashville?

89.3% of Metro Nashville rezoning cases with a final result were approved (243 of 272), based on Planning Commission action agendas from November 14, 2024 to October 22, 2026 matched to Metro Council bills.

How long does a rezoning take in Nashville compared with Huntsville?

The median approved case took 82 days from the Planning Commission's final action to the final Council vote in Nashville and 58 days in Huntsville. Add the filing and staff review period before the first Commission hearing.

Which rezoning requests fail most often in Nashville?

Requests for a multifamily (RM) district had the lowest approval rate, 76% (19 of 25). Cases the Planning Commission deferred at least once were approved 77.3% of the time, against 95.1% for cases never deferred.

Which Middle Tennessee city denies the most rezonings?

Clarksville. Its City Council approved 67.2% of rezoning cases with a final result (41 of 61) and voted down 20, 18 of them on first reading. Franklin approved 100% (21 of 21), Murfreesboro 92.9% (26 of 28) and Nashville 89.3% (243 of 272).

How often is this report updated?

Monthly. Each edition is added to this page with its date, and the case files behind it are in the Rezoning Approval Tracker. This is the November 2026 edition, updated November 10, 2026.

Can I reuse these numbers and charts?

Yes. The data, tables and charts are licensed CC BY 4.0. Credit "Liberty Acres, Nashville & Huntsville Rezoning Report 2026" with a link to this page.