← Guides

Wetlands on your property: how to check, which rules apply and what it means for value

Start with the U.S. Fish and Wildlife Service Wetlands Mapper, but treat it as a screening tool: its maps use a biological definition of wetlands and do not show which wetlands are regulated. Whether a federal permit is needed to fill or build in a wetland is decided under the Clean Water Act, which since the 2023 Sackett decision covers fewer wetlands than before, and states can add their own rules.

How can you check for wetlands?

The National Wetlands Inventory Wetlands Mapper shows mapped wetlands across the country. The Fish and Wildlife Service cautions that these data are developed using a biological definition of wetlands and may not match boundaries set under the Clean Water Act, may not reflect landscape changes since mapping, and should not be read as showing the presence, absence or extent of regulated wetlands. For a parcel decision, a consultant delineates wetlands on site using soils, plants and water.

County GIS viewers often carry soils and flood layers too; see our county parcel viewer and GIS directory.

Which wetlands are federally regulated after Sackett?

Section 404 of the Clean Water Act requires a permit to discharge dredged or fill material into waters of the United States. In Sackett v. EPA, decided May 25, 2023, the Supreme Court limited federal coverage of wetlands to those with a continuous surface connection to other covered waters. EPA and the Army issued a conforming rule, published in the Federal Register and effective September 8, 2023.

The rules are still changing. EPA says the January 2023 rule, as amended, applies where it is not enjoined, and in other states the agencies follow the pre-2015 regime consistent with Sackett. On September 9, 2026, the agencies published a supplemental proposal for an updated definition, building on a November 2025 proposal. This is general information, not legal or tax advice.

What is a jurisdictional determination?

A jurisdictional determination (JD) is the Army Corps of Engineers' written finding on whether wetlands or streams on a site are waters of the United States. An approved JD is the Corps' official determination and can be appealed; a preliminary JD treats the waters as jurisdictional for permitting without deciding the question. EPA keeps a public database of approved JDs, and each Corps district takes requests.

Do states regulate wetlands too?

Yes. A federal permit triggers a state water quality certification under Clean Water Act section 401, and some states require their own permits for work in streams and wetlands whether or not the federal government has jurisdiction. Local zoning, buffer and stormwater rules may also apply. The land entitlements guide explains how these reviews fit into a rezoning or subdivision approval.

State examples: wetlands in Tennessee and Alabama

Tennessee: TDEC protects wetlands as waters of the state, and alterations generally need an Aquatic Resource Alteration Permit (ARAP) from TDEC, which can apply even where there is no federal permit.

Alabama: the Alabama Department of Environmental Management (ADEM) issues Clean Water Act section 401 water quality certifications for federally permitted projects, and Corps districts within the South Atlantic Division handle section 404 permits and jurisdictional determinations in Alabama.

How do wetlands affect land value?

Wetlands can reduce the buildable area, require setbacks or mitigation, and add time and studies to a development plan. Land that is mostly upland with a small wetland is often still developable if the plan avoids the wet area. Land that is largely wetland may be best suited to conservation, recreation or timber. See our page on selling wetland-restricted property and our land appraisal guide. If your land has development potential, see selling land that is already entitled.

Common questions

Is the National Wetlands Inventory map official for permits?

No. The Fish and Wildlife Service says its data should not be read as showing the presence, absence or extent of regulated wetlands.

What did Sackett v. EPA change?

The 2023 decision limited federal Clean Water Act coverage to wetlands with a continuous surface connection to other covered waters.

Can I build on land with wetlands?

Often on the upland part. Filling a regulated wetland needs a permit, and state rules may still apply where federal rules do not.

Who decides whether my wetland is regulated?

The U.S. Army Corps of Engineers, through a jurisdictional determination, along with your state environmental agency for state rules.

Do I need a Tennessee permit to alter a wetland?

Generally yes. TDEC issues Aquatic Resource Alteration Permits for work in streams and wetlands.

Are wetland rules changing in 2026?

Yes. EPA and the Army published a supplemental proposed rule on September 9, 2026. Check EPA's waters of the United States pages for current status.

Sources