A wetland delineation maps exactly where wetlands begin and end on a property. Landowners and developers order one before grading, filling or building near wet areas, because filling a regulated wetland without a permit can bring penalties and restoration orders.

How is a wetland identified?

The EPA explains that the Corps and EPA use the 1987 Corps of Engineers Wetlands Delineation Manual and its Regional Supplements to identify wetlands for the Clean Water Act Section 404 program. The method looks at three things: soils, vegetation and hydrology. An area that meets all three criteria is considered a wetland. Hydric soils form when soil stays saturated during the growing season, and the plants adapted to those conditions are called hydrophytes.

Standing water alone is not proof. The EPA notes that many wetlands are often dry and many uplands are very wet after storms, so the season and recent rainfall have to be taken into account.

How does a wetland delineation work?

A wetland scientist or environmental consultant reviews maps first, such as soil surveys, the National Wetlands Inventory and aerial photos. Then they walk the site, dig soil pits, record the plants and look for signs of water at sample points on each side of the suspected boundary, filling out the Corps data sheets for the regional supplement. The boundary is flagged in the field and usually surveyed so it can be drawn on a site plan. The consultant writes a report with the data sheets, maps and photos.

Preliminary vs approved jurisdictional determinations

The EPA explains that the Corps makes jurisdictional determinations, which decide whether a water will be regulated under Section 404. Most often, the applicant submits a preliminary delineation that the Corps verifies. The applicant can then ask for an approved determination or move ahead with a permit application on the verified preliminary delineation. Requests go to the Corps district that covers the property, and the Corps takes them through its online Regulatory Request System.

Wetland delineation and permit checkpoints

Tennessee fees are TDEC's published ARAP schedule, read November 2026. Federal steps are from the EPA and Corps pages linked. Checked Nov 3, 2026.

StepWhoWhat you get or paySourceSource
Three-criteria delineation (soils, vegetation, hydrology)Wetland consultant using the 1987 manual and regional supplementsFlagged, mapped boundary and reportUS EPASource
Preliminary or approved jurisdictional determinationUS Army Corps of Engineers districtCorps verification of the boundary and jurisdictionUS Army Corps of EngineersSource
Tennessee ARAP, personal residence or family farmTDEC$50 application feeTDEC ARAP pageSource
Tennessee general permit coverageTDEC$500 application feeTDEC ARAP pageSource
Tennessee individual ARAPTDEC$2,500 or $5,000 application feeTDEC ARAP pageSource
Alabama Section 401 certificationADEMState water quality certification for Corps permitsADEMSource

When do you need a wetland delineation?

You usually need one when you plan to grade, fill, build a road or pond, or subdivide near low, wet or hydric-soil areas, or when a buyer, lender or local planning office asks for it. Development site plans often must show wetland boundaries and buffers. If map tools or a site visit suggest wetlands, our wetlands on property guide explains how they affect value and use.

How a delineation fits into due diligence

A delineation is one of several site studies a buyer orders, along with a land survey, a flood zone check and a perc test. Our land feasibility checklist shows where it fits. If you are weighing what the land could become, the land entitlements guide and the land development process guide explain how zoning, utilities and approvals add value, and how to rezone land covers the rezoning steps. Knowing the buildable acreage early helps you price the land and set realistic expectations for a rezoning.

State examples: wetland permits in Tennessee and Alabama

Tennessee: the Tennessee Department of Environment and Conservation requires an Aquatic Resource Alteration Permit (ARAP) or a Section 401 water quality certification for work that alters streams or wetlands, including filling or draining a wetland. TDEC's published application fees are $50 for a personal residence or family farm, $500 for general permit coverage, and $2,500 or $5,000 for individual permits. TDEC says general permit authorizations normally take three to four weeks, and individual permit decisions come within 90 days.

Alabama: Alabama does not issue a separate state permit for filling wetlands. Wetland fill is regulated by the Corps under Section 404, and the Alabama Department of Environmental Management issues the Section 401 water quality certification for Corps permits. This is general information, not legal, tax or lending advice.

Common questions

What does wetland delineation mean?

It is the process of finding and mapping the exact boundary between wetlands and dry upland on a property.

Who does a wetland delineation?

Usually an environmental consultant or wetland scientist. The Corps of Engineers can then verify the boundary.

What are the three wetland criteria?

Hydric soils, hydrophytic vegetation and wetland hydrology. An area meeting all three is considered a wetland.

Do I need a permit to fill a wetland?

Often, yes. Filling regulated wetlands needs a Corps Section 404 permit and, in some states, a state permit.

How do I get a wetland delineation verified?

Submit the consultant's delineation to the Corps district for the area, through the Corps Regulatory Request System.

Can I sell land that has wetlands?

Yes. Wetlands reduce buildable acreage, but the land can still be sold, and buyers will price the usable area.