How to prepare land for construction: the steps and permits
Preparing land for construction starts with due diligence and permits, not bulldozers. Confirm zoning, utilities and soils, then call 811, get any stormwater permit, and only then clear, grade and build access.
What due diligence comes before site work?
Check the zoning and what it allows (how to find your property's zoning), the flood map (flood zone guide), wetlands (wetlands on property), and whether the land can be served by sewer or septic (perc test and water, sewer and septic approval). The land entitlements guide covers the approvals that come before building.
Do you need a survey and site plan?
A boundary survey sets the lines and a topographic survey shows grades for drainage design. Many projects need an approved site plan before a grading or building permit; see site plan approval and the land development process.
Why call 811 before you dig?
Calling 811 a few days before digging gets underground utility lines marked for free, as the national 811 program explains. Hitting a gas or power line is dangerous and costly, and state law requires a locate request before excavation.
When do you need a stormwater construction permit?
Under the Clean Water Act, construction that disturbs 1 or more acres, or less than 1 acre if part of a larger common plan of development, generally needs NPDES stormwater permit coverage, according to the EPA. Most states, including Tennessee and Alabama, issue this permit themselves. Coverage requires a stormwater pollution prevention plan with erosion and sediment controls such as silt fence and stabilized entrances.
What does clearing and grading involve?
Clearing removes trees and brush; marketable timber can sometimes be sold first (see the timber value calculator). Grading shapes the land for drainage and building pads, and compacted fill may need testing. Then come access roads, a driveway permit if you connect to a public road, and utility trenches. This is general information, not legal or tax advice.
For a cost range, see how much land clearing costs.
State examples: preparing land in Tennessee and Alabama
Tennessee: TDEC issues the general NPDES permit for stormwater discharges from construction activities, and work in streams or wetlands generally needs an Aquatic Resource Alteration Permit (ARAP).
Alabama: ADEM issues the Construction General Permit for stormwater from construction sites, and Alabama 811 takes locate requests before digging.
Is it better to prepare land before selling?
Not always. Site work costs money up front, and a builder may want to design its own grading. Approvals such as zoning and utility capacity often add more value than physical work. If your land has development potential, see selling land that is already entitled.
Common questions
What is the first step in preparing land to build?
Due diligence: confirm zoning, utilities, soils, flood and wetland status before any site work.
Do I need a permit to clear land?
Often. Disturbing 1 acre or more generally triggers a stormwater construction permit, and many counties require grading permits.
Is calling 811 free?
Yes. The 811 locate service marks underground utility lines at no charge.
What is a SWPPP?
A stormwater pollution prevention plan, which describes the erosion and sediment controls used on a construction site.
Who issues stormwater permits in Tennessee and Alabama?
TDEC in Tennessee and ADEM in Alabama.
Can I sell my timber before clearing?
Often yes, if it is merchantable. A consulting forester can estimate its value.