Rezoning fees and timelines in the Nashville and Huntsville areas

Across 28 Nashville metro and Huntsville area governments we checked, a standard rezoning application fee runs from $100 in Ashland City to $2,050 for a Metro Nashville zone change, more for large or planned projects. Where zoning applies, an elected council or commission decides after a planning commission review. Metro Nashville says it takes 3 to 6 months. Further down, we count outcomes and timing in 128 Metro Nashville cases heard in 2026 and 49 Huntsville cases from November 2024 to October 2026.

Own land in one of these counties or cities? See how we buy land that needs rezoning.

New: the Rezoning Approval Tracker lists every recent Nashville and Huntsville rezoning case with its outcome and days to a decision, plus a time and fee estimator and free CSV downloads.

New research: the Nashville & Huntsville Rezoning Report 2026 shows which rezoning requests pass, which stall after a deferral and how long a decision takes, from 373 recent cases, with free charts and data.

New: the Rezoning Fee Index compares the published rezoning application fee in 57 Tennessee and Alabama cities and counties, sortable, with the median, the range and a free CSV.

Part of our land entitlements guide: rezoning, subdivision, site plans, variances, use permits, annexation and utility approvals, and how each affects a sale.

Rezoning fees, deciders and timelines by county and city

Download this table as a CSV. 28 rows, checked Oct 25, 2026 to Nov 9, 2026.

County or cityWho decidesApplication feeTypical timelineMeeting calendarSourceAs of
Metro Nashville and Davidson CountyDavidson County, TNMetro Council, on three readings, after a Metro Planning Commission recommendationZone change $2,050. Specific Plan $2,900, $4,500 or $6,100 by number of homes3 to 6 months if there are no complications (Metro)CalendarSource
Williamson County (unincorporated)Williamson County, TNCounty Commission, after a Planning Commission hearing$300 per rezoning request (no fee when the Planning Commission, County Commission or staff initiate it)Applications due at noon on a Monday about four weeks before the Planning Commission meetsCalendarSource
FranklinWilliamson County, TNBoard of Mayor and Aldermen, on three readings$500 (fee page effective May 1, 2019)not publishednot publishedSource
BrentwoodWilliamson County, TNCity Commission, on two readings, after a Planning Commission recommendation$1,000 under 25 acres, rising to $5,000 for 200 acres or morenot publishedCalendarSource
Rutherford County (unincorporated)Rutherford County, TNBoard of Commissioners, after a Regional Planning Commission recommendation$1,000 standard rezoningAbout 11 weeks from filing deadline to final vote on the 2026 calendarCalendarSource
MurfreesboroRutherford County, TNCity Council, after a Planning Commission recommendation$700, or $950 for a PUD (undated fee sheet)not publishednot publishedSource
SmyrnaRutherford County, TNTown Council, on two readings, after a Planning Commission recommendation$750, or $1,000 for a planned development (fee table, Sept. 2026)not publishednot publishedSource
Wilson County (unincorporated)Wilson County, TNCounty Commission, after a Planning Commission recommendation$600 plus $10 per acre (effective October 21, 2026)Applications due at noon on a Tuesday, about a month before the Planning Commission meetingCalendarSource
Sumner County (unincorporated)Sumner County, TNCounty Commission, after the Regional Planning Commission$1,000 plus a $25 sign fee and $15 for each added frontage (effective September 21, 2026)not publishedCalendarSource
GallatinSumner County, TNCity Council, after the Planning Commission$1,000 without a master plan (effective November 5, 2024)Example: October 13, 2026 deadline, November 16 Planning Commission meetingCalendarSource
HendersonvilleSumner County, TNBoard of Mayor and Aldermen, on two readings, after the Planning Commission$1,576 for a straight rezoning (2026 schedule)not publishednot publishedSource
Maury County (unincorporated)Maury County, TNCounty Commission, after the Regional Planning Commission$500 plus a $5 fee (effective January 1, 2026)not publishedCalendarSource
ColumbiaMaury County, TNCity Council, after the Planning Commission$450 for 10 acres or less, plus $30 per acre for the next 90 acres and $5 per acre above 100 (rev. February 13, 2025)Example: October 19, 2026 filing, December 9 Planning Commission meetingCalendarSource
Spring HillMaury County, TNPlanning Commission vote, final body not published in our sources$1,000 (approved July 1, 2024)Example: September 21, 2026 filing deadline, November 9 Planning Commission voteCalendarSource
Robertson County (unincorporated)Robertson County, TNCounty Commission, after the Planning CommissionResidential $300 (1 to 4 lots) or $500 (5 or more). Commercial or industrial $500 or $750. Signs extra (effective November 1, 2023)Applications due about four to five weeks before the meeting. Example: October 16, 2026 deadline, November 19 meetingCalendarSource
SpringfieldRobertson County, TNBoard of Mayor and Aldermen, by ordinance on two readings, after a Planning Commission recommendationAgricultural or residential $200 to $700 by acreage. Commercial or industrial $350 to $1,100Example: October 28, 2026 initial submittal, December 3 Planning Commission meetingCalendarSource
Cheatham County (unincorporated)Cheatham County, TNCounty Commission, after the Regional Planning Commission$130 plus certified letters and a $5 archive feeDeadlines about four weeks before each meeting. Example: October 8, 2026 deadline, November 5 meetingCalendarSource
Ashland CityCheatham County, TNMayor and City Council, after the Planning Commission$100File at least 30 days before the meeting. Example: October 27, 2026 shutoff, December 7 meetingCalendarSource
Pleasant ViewCheatham County, TNBoard of Mayor and Aldermen, after the Planning Commission$500not publishednot publishedSource
Dickson County (unincorporated)Dickson County, TNCounty Commission, after the Regional Planning Commissionnot published (the County Commission sets the fee)not publishedCalendarSource
City of DicksonDickson County, TNCity Council, after the Planning Commission$200 (Ordinance 1540, October 2, 2023)not publishednot publishedSource
HuntsvilleMadison County, ALCity Council, after the Zoning Committee and Planning Commission$500 up to 5 acres, $600 for 5.1 to 10, $700 for 10.1 to 40, $800 over 40Monthly cycle. Example: October 6, 2026 turn-in, October 27 Planning CommissionCalendarSource
Madison (city)Madison County, ALCity Council, by a majority of elected members$1,500 for a zoning map amendmentComplete application due 30 days before the Planning Commission (third Thursday)CalendarSource
Limestone County (unincorporated)Limestone County, ALNo county zoning (the County lists no planning and zoning)no county rezoningno county rezoningnot publishedSource
AthensLimestone County, ALCity Council, after the Planning Commission$1,000 plus advertising (rev. October 23, 2025)Due 26 days before the Planning Commission (third Tuesday)CalendarSource
Morgan County (unincorporated)Morgan County, ALNo county zoning stated (the County Engineer handles subdivisions)no county rezoning statedno county rezoning statednot publishedSource
DecaturMorgan County, ALCity Council, after a Planning Commission recommendation$1,000 plus certified letters (about $10 each) and legal advertisingnot publishedCalendarSource
HartselleMorgan County, ALCity Council$750 for annexation and rezoningAbout 6 weeks from application to the Council vote (City)CalendarSource

How to read the table

Each row is one county or city. A county row covers land outside city limits. A city row covers land inside that city, which follows the city's own zoning.

"Not published" means the official source we used does not list that item. "As of" is the date we last checked the source. Fees change, so confirm the amount with the planning office before you file.

Not sure which government zones your land? Start with how to find your property's zoning.

What the table shows

Smaller towns charge the least. Ashland City lists $100, and Cheatham County lists $130 plus certified letters.

Several fees grow with the size of the land. Brentwood, Huntsville, Columbia, Springfield and Wilson County all charge more for bigger tracts. Metro Nashville prices a Specific Plan by the number of homes, from $2,900 to $6,100.

Two Alabama counties have no county zoning. Limestone County lists no planning and zoning, and in Morgan County the County Engineer handles subdivisions. Inside Athens, Decatur and Hartselle, the city's rules apply.

Few governments publish a timeline. Metro Nashville says 3 to 6 months if there are no complications. Hartselle says about 6 weeks from application to the Council vote. Rutherford County's 2026 calendar puts about 11 weeks between the filing deadline and the final vote. Elsewhere, the meeting calendar shows how far apart the filing deadline and the hearings fall.

For Nashville and Huntsville, we also counted outcomes and timing across every rezoning case on the Planning Commission agendas. Those numbers are further down this page, with free case-by-case CSV files.

Download the fee table

The same table is available as a CSV file: rezoning-fees-nashville-huntsville.csv. It has one row per county or city, with the source link and the date we checked it.

You are welcome to reuse it. Please link back to this page so readers can find the latest version.

How we built the fee table

Every fee and rule comes from an official county or city document, linked in the table and in the sources below. We did not estimate any fee. Where a fee sheet is undated, the row says so.

The county pages go deeper on each place, including zoning districts and filing steps. See Davidson County, Williamson County, Rutherford County, Wilson County, Sumner County, Maury County, Robertson County, Cheatham County, Dickson County, Huntsville, Madison, Limestone County and Morgan County.

If you spot a change, tell us and we will fix it.

Key numbers: Nashville rezoning in 2026

The sample is every Metro Nashville zone change (base district), Specific Plan and Urban Design Overlay case that appeared on a 2026 Planning Commission action agenda through October 22, 2026. That is 128 cases: 75 base zone changes, 43 new SPs, 8 SP amendments and 2 UDO amendments. Text amendments, subdivisions and other items are left out. Council outcomes are as of November 2, 2026.

Two numbers stand out. The Planning Commission recommended approval in 111 of the 115 cases it voted on. And of the 76 cases whose Council bills reached a final result, none were voted down: 73 passed, 2 were withdrawn and 1 was deferred indefinitely.

Nashville rezoning in 2026: key numbers

128 zone change, SP and UDO cases on Metro Planning Commission action agendas, Jan. 8 to Oct. 22, 2026. Council outcomes as of Nov. 2, 2026. Checked Nov 9, 2026.

Download the full case data as a CSV.

MeasureResultCases countedSource
Cases in the sample75 base zone changes, 43 new SPs, 8 SP amendments, 2 UDO amendments128Source
Planning Commission recommended approval111 (96.5 percent), including 47 with conditions115 votedSource
Planning Commission recommended disapproval4 (3.5 percent)115 votedSource
Deferred at least once at the Planning Commission32 (25 percent), 60 deferrals in all128Source
Council result73 passed, 2 withdrawn, 1 deferred indefinitely, 0 voted down76 with a final resultSource
Median days, first Planning Commission agenda to final vote82 (range 26 to 299)73 passedSource
Specific Plan share51 SP or SP amendment (40 percent)128Source
Median acreage0.86 acres (range 0.10 to 82.37)128Source
Most common changeRS5 to R6-A18 of 75 base casesSource

How long does a Nashville rezoning take?

For the 73 cases that passed the Council, the median time from a case's first Planning Commission agenda to the Council's third and final reading was 82 days, with a range of 26 to 299 days. Metro's calendar is fixed, so most cases move in step: 57 of 73 (78 percent) reached a final vote within 89 days of the Commission's recommendation.

Deferrals are what stretch a case. The 20 passed cases with at least one deferral had a median of 117 days.

Specific Plans took longer than base rezonings: the 24 passed SPs ran about two weeks longer at the median than the 43 passed base zone changes, as the table below shows. After final passage, Legistar shows each of the 73 ordinances taking effect 10 days later.

These figures start at the Planning Commission. They do not include the time before a case reaches its first agenda: Metro's filing deadlines run about six weeks before each meeting, and a pre-application meeting comes before that. Metro's own estimate for the whole process is 3 to 6 months without complications.

Days from Planning Commission recommendation to final Council vote

Passed cases only. Days run from the Commission's final recommendation to the Council's third reading. Checked Nov 9, 2026.

GroupPassed casesMedian days from recommendationRangeSource
All passed cases736826 to 208Source
Base zone change436826 to 194Source
New Specific Plan248254 to 208Source
SP amendment56854 to 131Source
No deferral anywhere (from first agenda)5368Not shownSource
At least one deferral (from first agenda)20117Not shownSource

How often does Metro approve or deny rezonings?

At the Planning Commission, 64 cases were recommended for approval and 47 for approval with conditions, which Metro often writes as "approve with conditions and disapprove without all conditions." The Commission recommended disapproval in 4 cases, all base zone changes. Another 4 were withdrawn, 5 were deferred indefinitely, and 4 were still deferred to a later meeting as of the October 22 agenda.

A disapproval does not end a case in Nashville. The bill can still go to the Council, and Council rules require a roll call vote on third reading for any zoning matter the Commission disapproved. Three of the 4 disapproved cases have Council bills still pending and one has no bill yet. None had reached a final vote by November 2.

On the Council side, 99 of the 128 cases had a bill on file by November 2. Of the 76 bills that reached a final result, 73 passed, 2 were withdrawn and 1 was deferred indefinitely. The Council did not vote down any bill in the sample. The other 23 bills are still moving, and 29 cases had no Council bill filed yet, mostly cases the Commission heard in September and October.

How often are Nashville rezoning cases deferred?

32 of the 128 cases (25 percent) were deferred at least once at the Planning Commission, for 60 deferrals in all. The most for one case was 5. SPs were deferred far more often than base rezonings: 18 of 43 new SPs (42 percent) against 9 of 75 base zone changes (12 percent).

At the Council, 19 of the 99 bills on file were deferred at least once. Deferrals show up in the timing: passed cases with any deferral took a median of 117 days from first agenda to final vote, about seven weeks longer than cases with none.

Which zoning changes are most common in Nashville?

The most common single request was RS5 to R6-A, in 18 of the 75 base zone changes. RS5 is a single-family district and R6-A allows two-family homes, so most of these were small lots seeking a second unit. R6-A was the target district in 21 base cases, and the Commission recommended approval in all 21.

Other repeat moves were RS10 to R10 (8 cases), RS7.5 to R8-A (4) and RS7.5 to R6-A (3). Of the 75 base cases, 51 started in an RS single-family district. For new SPs the most common starting district was AR2a, the agricultural and residential district, in 9 of 43 cases.

Most common base zone changes in Nashville, 2026

Base zone change cases by from and to district, as described on the Planning Commission agenda. Checked Nov 9, 2026.

FromToCases (of 75)Source
RS5R6-A18Source
RS10R108Source
RS7.5R8-A4Source
RS7.5R6-A3Source
RS5MUN-A-NS2Source
RS7.5RM20-A-NS2Source
RS20R202Source

How big are the parcels being rezoned in Nashville?

Most Nashville rezonings are small. The median case covered 0.86 acres, and 69 of the 128 cases were under one acre. Base zone changes had a median of 0.40 acres and new SPs 3.0 acres. The range ran from 0.10 to 82.37 acres, and 22 cases covered 10 acres or more. All 128 cases together covered about 848 acres.

Larger tracts tend to go the SP route. The 12 cases starting from AR2a zoning ranged from 0.93 to 82.37 acres, and 9 of them were SPs.

How much does it cost to rezone land in Nashville?

Metro Planning's fee is $2,050 for a base zone change, so all 75 base cases in the sample paid that application fee. An SP costs $2,900, $4,500 or $6,100 depending on the number of units or the non-residential floor area, and a UDO amendment costs $2,800.

We could set the SP tier from the agenda description for 24 new SPs that list a residential unit or lot count. 16 of them fall in Tier 3 ($6,100), 5 in Tier 2 ($4,500) and 3 in Tier 1 ($2,900), so the typical residential SP in the sample paid $6,100. The other 19 new SPs were mixed-use or non-residential and the agenda does not give enough detail to set a tier, and we do not estimate fees for SP amendments.

These are Metro's application fees only. Surveys, site plans, traffic studies, engineering and legal help are extra, and the public records do not show what applicants spent on them, so we do not estimate them.

For comparison, our Huntsville rezoning data found a City fee of $500 to $800 by acreage and a 58-day median from the Planning Commission to the Council's final vote across 45 approved cases from November 2024 to October 2026.

Metro Nashville rezoning fees and the 2026 cases they apply to

Fees as published by Metro Planning. SP tiers estimated from the unit or lot count in each agenda description. Checked Nov 9, 2026.

ApplicationMetro feeCases in sampleSource
Zone change (base district)$2,05075Source
SP Tier 1 (0 to 5 units, or under 10,000 sq ft non-residential)$2,9003Source
SP Tier 2 (6 to 25 units, or 10,000 to 25,000 sq ft)$4,5005Source
SP Tier 3 (26 or more units, or over 25,000 sq ft)$6,10016Source
SP, tier not shown on agenda (mixed-use or non-residential)$2,900 to $6,10019Source
Urban Design Overlay amendment$2,8002Source

Download the Nashville rezoning data

The full case list is a free CSV: nashville-rezoning-cases-2026.csv. It has one row per case, 128 rows, and uses public records only. It does not include owner or applicant names or property addresses.

Columns: case_number, case_type, council_district, acres, from_zoning, to_zoning, first_pc_agenda_date, pc_deferrals, pc_final_action_date, pc_recommendation, council_bill, other_bills, council_filed_date, council_first_reading, council_deferrals, council_third_reading, council_outcome, effective_date, days_pc_to_final_vote, application_fee_estimate, pc_action_agenda_url and legistar_url. Each row links to its Planning Commission action agenda and its Council bill.

You are free to reuse the data with credit to Liberty Acres under a Creative Commons Attribution 4.0 license.

How we built the Nashville case dataset

Planning Commission data comes from the 17 action agendas Metro posted for its 2026 meetings: January 8, February 12 and 26, March 12 and 26, April 9 and 23, May 14 and 28, June 11 and 25, July 23, August 13 and 27, September 10 and 24, and October 22. We kept every case numbered as a zone change (Z), Specific Plan (SP) or Urban Design Overlay (UD) and left out text amendments. For each case we recorded the acreage and the from and to districts in the agenda's description, every "MPC Action" line, and the date of the final non-deferral action. Deferral counts also use the posted agendas from July 24 to December 11, 2025, for cases that were first heard in 2025.

Council data comes from Metro's public Legistar records. We matched each case number to its ordinance, left out the companion building-material bills, and took the filing, first reading, deferral, third reading and effective dates from each bill's history. Where a case had a refiled bill, we used the one that went furthest.

Limits: the timing figures cover only the 73 cases that passed, and cases still pending could change the median. Metro posts no action agenda for January 22, July 9 or October 8, 2026, and we found no record of Commission actions on those dates in the agendas. Acreage and districts are as described on the agenda. SP fee tiers are an estimate from the unit counts in each description, counting each lot as one unit.

What this means if you own land in Davidson County

Metro approves most rezonings that reach a vote, but the process still runs two to three months past the Planning Commission and longer with deferrals, and the fees, plans and studies come out of the owner's pocket first. Some owners would rather sell the land as it is.

Liberty Acres is family-owned and we made about 250 land purchases in the last 12 months, including land that needs rezoning. We'll do what makes sense for your situation, whether that is buying the land as zoned or working through the process with you. Our Nashville rezoning guide covers the steps, deadlines and contacts.

Key numbers: Huntsville rezoning, November 2024 to October 2026

The sample is every zoning map case on a posted Huntsville Planning Commission agenda from November 19, 2024 through October 27, 2026. That is 49 cases: 30 zonings of land that had no city district yet, 17 rezonings from one city district to another, and 2 neighborhood rezonings the City started itself. Text amendments and plat restriction changes are left out. Council outcomes are as of November 3, 2026.

Two numbers stand out. The City Council approved all 45 cases that reached a final vote and denied none. And every case the Planning Commission acted on went to the Council with a recommendation; the posted minutes record no recommendation of denial in the sample.

Huntsville zoning cases, Nov. 2024 to Oct. 2026: key numbers

49 zoning map cases on posted Huntsville Planning Commission agendas, Nov. 19, 2024 to Oct. 27, 2026. Council outcomes as of Nov. 3, 2026. Checked Nov 9, 2026.

Download the full case data as a CSV.

MeasureResultCases countedSource
Cases in the sample30 zonings of land with no city district, 17 rezonings, 2 City-started neighborhood rezonings49Source
Council approved45 (every case with a final vote)45Source
Council denied045Source
Pending or withdrawn3 pending, 1 withdrawn4Source
Unanimous Planning Commission vote2833 with a recorded voteSource
Median days, Planning Commission to final Council vote58 (range 30 to 72)45Source
Median days, hearing set to final Council vote42 (range 28 to 49)45Source
Median acreage20.1 acres (range 0.33 to 1,013.96)46Source
Most common target districtResidence 2 (17 cases), Highway Business C-4 (16)49Source

How long does a Huntsville rezoning take?

For the 45 approved cases, the median time from the Planning Commission meeting to the Council's final vote on the ordinance was 58 days. The range was 30 to 72 days. Huntsville's calendar is fixed, so most cases move in step: 20 took exactly 58 days and 16 took exactly 65, so 36 of the 45 (80 percent) finished in 58 or 65 days.

The Council handles each case in two steps. It first passes a resolution setting the public hearing, a median of 16 days after the Commission meeting. It then holds the hearing and votes on the ordinance a median of 42 days after that (range 28 to 49). The Zoning Ordinance requires the amending ordinance to be published once a week for two weeks, at least 15 days before it passes.

The type of case made little difference. Zonings of land with no prior city district and rezonings both had a median of 58 days. The two City-started neighborhood rezonings took 58 and 72 days. Only one case went to a second Commission meeting: a Planned Development-Housing rezoning first on the October 28, 2025 agenda was recommended at a special called meeting on November 18, 2025. The Council also postponed one hearing resolution and set two others a second time.

These figures start at the Planning Commission. They do not include the time before a case reaches its first agenda. On the City's 2026 rezoning calendar, the Commission meets three to four weeks after each turn-in date.

Days from Planning Commission meeting to final Council vote, Huntsville

Approved cases only. Days run from the Commission meeting that sent the case to the Council to the Council's vote on the ordinance. Checked Nov 9, 2026.

GroupApproved casesMedian daysRangeSource
All approved cases455830 to 72Source
Zoning of land with no city district295830 to 72Source
Rezoning145830 to 72Source
City-started neighborhood rezoning26558 to 72Source
Hearing set to final vote (all approved)454228 to 49Source

How often does Huntsville approve or deny rezonings?

At the Planning Commission, posted minutes record a vote in 33 cases. 28 were unanimous. Four drew at least one no vote, and the closest was 6 to 2 with one abstention, on a 505.42-acre Planned Development-Housing rezoning in May 2026. In one more case a member recused. In 2 cases the minutes show the case going forward without stating the vote. The City had not posted minutes for October 2025 or June through October 2026, which covers 13 other cases. One more case was withdrawn.

On the Council side, 46 cases had reached a public hearing resolution by November 3, 2026. 45 were approved and none were denied or withdrawn. One case, a 126.70-acre rezoning from Highway Business C-4 to Commercial Industrial Park, has its hearing set for November 19, 2026. Two cases heard by the Commission on October 27, 2026 had no Council action yet, and one case was withdrawn before that meeting.

The Council does not have to grant the district an owner asks for. The City's rezoning application says the Council may rezone the land to any suitable district.

Why most Huntsville cases are zonings of newly annexed land

30 of the 49 cases (61 percent) were zonings of land with no city district on the agenda. The agenda lists only a proposed district for these, and staff describe many of them in the minutes as recently annexed property. Madison County does not zone unincorporated land, so land that joins the city gets its first city district through its own Commission hearing and Council ordinance.

The other 17 were rezonings of land already zoned by the City, and 2 were neighborhood rezonings the City started. The larger of those moved 4,502.73 acres of existing neighborhoods from Residence 2-A to Residence 2 in 2025.

Which zoning districts are most common in Huntsville?

Counting each district once per case, the most common target was Residence 2, in 17 cases. Highway Business C-4 was next with 16, then Commercial Industrial Park with 7 and Residence 1 with 4. Two cases asked for Planned Development-Housing, both over 380 acres.

Among the 17 rezonings, the most common move was Residence 1-B to Residence 2, in 4 cases, and Highway Business C-4 to Commercial Industrial Park came up twice. Six rezonings started wholly or partly in C-4, and three of those moved to Commercial Industrial Park.

Most common target districts in Huntsville zoning cases

Each district counted once per case, as described on the Planning Commission agenda. Some cases ask for more than one district. Checked Nov 9, 2026.

Target districtCases (of 49)Source
Residence 2 (R-2)17Source
Highway Business (C-4)16Source
Commercial Industrial Park (CIP)7Source
Residence 1 (R-1)4Source
Residence 1-A (R-1A)2Source
Residence 2-B (R-2B)2Source
Neighborhood Business (C-1)2Source
Planned Development-Housing (PD-H)2Source

How big are the parcels being rezoned in Huntsville?

Huntsville cases are much larger than the 0.86-acre median in our Nashville data. Leaving out the two City-started neighborhood cases, the median case covered 20.1 acres, with a range of 0.33 to 1,013.96 acres. 17 of the 46 cases with an acreage were 5 acres or smaller, and 9 covered 100 acres or more. Together they covered 4,728.87 acres.

Rezonings ran larger than zonings of newly annexed land: a median of 47.19 acres for the 17 rezonings against 6.47 acres for the 29 zonings with an acreage. The largest single case zoned 1,013.96 newly annexed acres to Residence 1 and Industrial Park in 2025.

Acreage is as listed on the Planning Commission agenda. In 10 cases the Council's ordinance title gives a slightly different figure, and the CSV keeps both.

How much does it cost to rezone land in Huntsville?

The City's rezoning application sets a non-refundable filing fee by acreage: $500 for up to 5 acres, $600 for 5.1 to 10 acres, $700 for 10.1 to 40 acres and $800 over 40 acres. By agenda acreage, 17 cases in the sample fall in the $500 bracket, 3 in the $600 bracket, 9 in the $700 bracket and 17 in the $800 bracket.

That is the published schedule, not a record of what each applicant paid, and we do not estimate fees for the two City-started cases. The form is marked Rev. 8/16, so confirm the fee with the Zoning Office. Surveys, legal descriptions, site plans and professional help are extra, and the public records do not show what applicants spent on them.

For comparison, our Nashville rezoning data found a $2,050 Metro fee for a base zone change and an 82-day median from first Planning Commission agenda to the Council's final vote in 2026.

Huntsville rezoning fees and the cases they apply to

Fee schedule from the City's Rezoning Application (Rev. 8/16). Cases placed by Planning Commission agenda acreage; City-started cases left out. Checked Nov 9, 2026.

AcreageCity feeCases in sampleSource
0 to 5 acres$50017Source
5.1 to 10 acres$6003Source
10.1 to 40 acres$7009Source
Over 40 acres$80017Source

Download the Huntsville rezoning data

The full case list is a free CSV: huntsville-rezoning-cases.csv. It has one row per case, 49 rows, and uses public records only. It does not include owner or applicant names or property addresses.

Columns: case_number, case_type, acres_pc_agenda, acres_council, from_zoning, to_zoning, pc_first_agenda_date, pc_final_date, pc_result, pc_vote, council_hearing_set_date, council_final_date, council_outcome, council_ordinance, days_pc_to_council_final, days_hearing_set_to_final, fee_bracket, pc_agenda_url, pc_minutes_url and legistar_url. Each row links to its Planning Commission agenda, its minutes where posted, and its Council ordinance.

You are free to reuse the data with credit to Liberty Acres under a Creative Commons Attribution 4.0 license.

How we built the Huntsville case dataset

Planning Commission data comes from the agendas and minutes the City posts on its Planning Commission page, for meetings from November 19, 2024 to October 27, 2026, plus the special called meeting of November 18, 2025. We kept every zoning or rezoning of land on the map and left out text amendments and plat restriction changes. For each case we recorded the acreage and districts in the agenda description and the vote in the minutes. Meeting dates come from the agendas.

Council data comes from the City's public Legistar records. We matched each case to its public hearing ordinance by acreage, location and districts, took the date the hearing was set from the ordinance title, and took the final vote date from the ordinance history.

Limits: the timing figures cover only the 45 approved cases. The City had not posted minutes for 13 cases, so their Commission votes are not in the data. Case 2502 does not appear on any posted agenda. One 25.14-acre rezoning approved by the Council in November 2025 is described in Legistar as recommended by the Planning Commission, but it is not on any posted agenda, so it is left out. If a case was heard at a meeting whose agenda the City has not posted, it is not in the sample.

What this means if you own land in Madison County

Huntsville approves the zoning cases that reach a vote, and the fee is low, but the process still runs about two months past the Planning Commission, plus the turn-in period before it. Land outside the city has to be annexed first, and the Council decides the district. Some owners would rather sell the land as it is.

Liberty Acres is family-owned and we made about 250 land purchases in the last 12 months, including land that needs rezoning or annexation. We'll do what makes sense for your situation, whether that is buying the land as zoned or working through the process with you. Our Huntsville rezoning guide covers the steps, deadlines and contacts.

Selling land that needs rezoning

Liberty Acres is a family-owned land company. We made about 250 land purchases in the last 12 months, and we pay back taxes and all closing costs. For larger parcels with development potential, we can sign terms that allow time for the rezoning, and we handle and pay for that work. We'll do what makes sense for your situation.

Read more on selling land that needs rezoning.

We buy land here as it is zoned or with the rezoning still ahead. For the local details, see sell land in Huntsville, AL.

Common questions

How much does it cost to rezone land near Nashville?

Metro Nashville lists $2,050 for a zone change and $2,900 to $6,100 for a Specific Plan. Nearby counties list $1,000 in Rutherford and Sumner, $600 plus $10 per acre in Wilson, $500 plus $5 in Maury, $300 to $750 in Robertson and $130 plus letters in Cheatham. Cities inside each county set their own fees. A Metro Urban Design Overlay amendment is $2,800. Surveys, plans and professional help are extra.

How much does it cost to rezone land in Huntsville?

Huntsville's application fee is $500 for up to 5 acres, $600 for 5.1 to 10 acres, $700 for 10.1 to 40 acres and $800 over 40 acres, and it is not refunded. Madison lists $1,500, Athens $1,000 plus advertising, Decatur $1,000 plus certified letters and Hartselle $750.

Who approves a rezoning in these areas?

Where zoning applies, an elected body makes the final decision after a planning commission review. That is the Metro Council in Nashville, the County Commission in most Tennessee counties, and the City Council in Huntsville, Madison, Athens and Decatur.

How long does it take to rezone land in Nashville?

In 2026 data from 73 passed Metro cases, the median was 82 days from a case's first Commission agenda to the Council's final vote. Add the filing period before the Commission, which Metro's calendar puts at about six weeks.

What percentage of Nashville rezonings are approved?

The Planning Commission recommended approval in 111 of 115 cases it voted on in 2026 (96.5 percent). Of 76 Council bills with a final result, 73 passed, 2 were withdrawn and 1 was deferred indefinitely. None were voted down. These counts come from the 2026-only sample of 128 cases. Our longer Rezoning Approval Tracker dataset (324 cases on Planning Commission agendas, November 2024 to October 2026) shows 89.3% approved (243 of 272 with a final result).

How often are Nashville rezoning cases deferred?

25 percent of 2026 cases (32 of 128) were deferred at least once at the Planning Commission. New SPs were deferred in 42 percent of cases, base rezonings in 12 percent. Passed cases with a deferral took a median of 117 days from first agenda to final vote.

How long does it take to rezone land in Huntsville?

In 45 approved cases from November 2024 to October 2026, the median was 58 days from the Planning Commission meeting to the City Council's final vote, with a range of 30 to 72 days. Add the three to four weeks between the turn-in date and the Commission meeting on the City's calendar.

What percentage of Huntsville rezonings are approved?

All 45 cases that reached a final Council vote in the sample were approved, and none were denied. The posted Planning Commission minutes record no recommendation of denial. One case was withdrawn and three were still pending on November 3, 2026.

Does land outside Huntsville need to be annexed before it can be zoned?

Yes. Madison County does not zone unincorporated land, so land has to be annexed into the city to get a city district. 30 of the 49 cases in the sample were zonings of land with no prior city district.

Where does this data come from?

Fees come from each county's or city's own fee sheet or application, linked in the table. Nashville case data comes from Metro Planning Commission action agendas and Metro Council records in Legistar. Huntsville case data comes from the City's Planning Commission agendas and minutes and its Legistar records. The case CSVs link each case to both and leave out owner and applicant names and addresses.

Can I download or reuse this data?

Yes. The fee table CSV, the Nashville case CSV and the Huntsville case CSV are free to reuse with credit to Liberty Acres under a Creative Commons Attribution 4.0 license.