Land subdivision costs: fees, plats and city examples

Land subdivision costs are the local plat or application fee plus survey, engineering, septic and recording. The Texas city fees below are from official schedules, and the table farther down compares posted fees in Tennessee and Alabama. Application fees are not the total bill.

Part of our land entitlements guide: rezoning, subdivision, site plans, variances, use permits, annexation and utility approvals, and how each affects a sale.

What are land subdivision costs in Waco, Dallas, Austin and San Antonio?

The queries we see most for this page are about land subdivision costs in those Texas cities. The figures below are published application or plan-review fees from each city's official schedule. They do not include the surveyor's plat, engineering, utility extensions or county recording, unless a schedule line says so. Cities change fee schedules, and Dallas notes that final fees are calculated at submittal.

Waco requires a plat inside city limits and its extraterritorial jurisdiction when a tract is divided into two or more lots. Dallas and Austin use major and minor (or infill) plat tracks, and Austin also charges a completeness check and may add Transportation, Water, Parks, Fire or Energy fees on a case-by-case basis. San Antonio adds a filing fee and, unless a line is marked otherwise, 4 percent technological and 4 percent development services surcharges.

Published plat fees in Waco, Dallas, Austin and San Antonio

Copied from each city's official fee schedule on November 10, 2026. These are application or plan-review fees, not a complete budget. Confirm the current schedule before you file. Checked Nov 10, 2026.

CityPublished fee (selected line)What the fee coversSource
Waco, TX$400Minor plat, 4 lots or less, without improvementsSource
Waco, TX$300Preliminary subdivision platSource
Waco, TX$500 + $5 per lotFinal, replat or amended subdivision platSource
Dallas, TX$2,895Minor plat, no lot over 3 acres, single-family, duplex or townhouse districtsSource
Dallas, TX$3,963Major preliminary plat, fewer than 20 lots, no lot over 3 acresSource
Dallas, TX$6,238Major final plat, fewer than 20 lots, no lot over 3 acresSource
Austin, TX$14,758.83Austin Development Services preliminary plan review (FY 2026-27, effective Oct. 1, 2026)Source
Austin, TX$11,239.81Austin Development Services final plat with a preliminarySource
Austin, TX$6,782.57Austin Development Services infill platSource
Austin, TX$1,176.67Completeness check (Development Services, Transportation and Watershed)Source
San Antonio, TX$718.75 + $92 per lotMajor single-family subdivision plat, before surchargesSource
San Antonio, TX$684.25 + $92 per lotMinor plat, 0 to 3 acres, before surcharges, plus $287.50 filing feeSource

What is the price to subdivide land in Tennessee and Alabama?

The table adds the posted plat and review fees for one example: 10 lots on 20 acres, through preliminary and final approval. It leaves out survey, engineering and construction.

Posted fees for 10 lots on 20 acres

Computed by Liberty Acres from each government's posted schedule on Nov. 3, 2026. Check the source before filing. Checked Nov 10, 2026.

GovernmentFees includedTotalSource
Huntsville, ALMajor subdivision: $100 + $5 per lot$150Source
Williamson County, TNConcept plan $100, preliminary plat $200, final plat $150 (septic fees excluded)$450Source
Limestone County, ALMajor subdivision: $500 + $20 per lot, + $0.25 per foot of new road$700 + roadSource
Wilson County, TNPreliminary and final plat: $450 each$900Source
Smyrna, TNPreliminary plat $600, final plat $500$1,100Source
Franklin, TNPreliminary and final plat: $750 each$1,500Source
Gallatin, TNPreliminary and final plat: $750 each$1,500Source
Brentwood, TNPreliminary plan and final plat: $850 each$1,700Source
Murfreesboro, TNPreliminary plat $1,250, final plat $750$2,000Source
Sumner County, TNPlats $600, plan review and inspection $3,000$3,600Source
Metro Nashville, TNConcept plan $3,000, final plat $1,375$4,375Source
Hendersonville, TNPlats $3,256, construction plans $3,230$6,486Source
Rutherford County, TNPlats $17,000, plan review, land disturbance and inspection $16,000$33,000Source

Why do subdivision fees vary so much?

Some governments charge only for the plat. Others also charge for plan review and inspection by the lot.

  • Plat fees only: Huntsville charges $100 plus $5 per lot for a major subdivision.
  • Per acre: Williamson County charges $5 per acre for a concept plan and $10 per acre for a preliminary plat.
  • Per foot of road: Limestone County adds $0.25 per foot of new road.
  • Plan review and inspection by the lot: Rutherford County adds $1,600 per lot, and Sumner County adds $300 per lot.
  • Construction plan fees: Hendersonville charges $3,230 for construction plans on top of $1,628 per plat.

Do subdivision fees cover the government's cost?

Often not. Williamson County's 2026 cost justifications put the average preliminary plat cost at $1,550.64, against an average fee of $1,033.50. The average final plat cost is $1,660.13, against an average fee of $360.

How much does a minor subdivision or lot split cost?

A minor subdivision makes a few lots with no new roads. The posted fees are much lower:

When does splitting land need no subdivision approval?

Some splits skip review, but the rules are local. Check before you sell a piece.

  • Limestone County excludes parcels over two acres with 80 feet of road frontage, no new utilities and no added runoff.
  • Wilson County requires approval for divisions under five acres outside the cities' growth boundaries.
  • Metro Nashville defines a subdivision as a division into lots under five acres.

What costs come on top of subdivision fees?

These are usually the larger costs:

  • A boundary and topographic survey, and the plat drawing.
  • Civil engineering for roads, drainage and grading.
  • Building any new road to the government's standard, or posting a bond for it.
  • Septic soil testing and permits. In Tennessee, TDEC charges $400 for a new conventional septic permit up to 1,000 gallons a day, plus a $100 inspection.
  • Water and sewer taps or line extensions, set by the utility.
  • Traffic or geologic studies when staff ask for them.

Should you subdivide before you sell?

It depends on whether you want to carry the cost and time of approval. You can also sell the land as it is to a buyer who handles the plat.

Liberty Acres is a family-owned land company based in Atlanta, Georgia. We buy land anywhere in the US, in any condition, including land that still needs approvals. On rezoning-terms deals, we handle the rezoning work and pay for it. For larger parcels with development potential, we can sign terms that allow time for zoning and entitlement work. You keep title until closing, closing comes later, and the price can reflect the value that work adds.

See how to subdivide land or what your land is worth to a developer.

Common questions

What are land subdivision costs in Waco, Texas?

The City of Waco's published planning fees are $400 for a minor plat of 4 lots or less without improvements, $300 for a preliminary subdivision plat, and $500 plus $5 per lot for a final plat or replat. The surveyor's plat, any engineering and recording come on top. Waco requires a plat inside city limits and its extraterritorial jurisdiction when a tract is divided into two or more lots.

What are land subdivision costs in Dallas?

The City of Dallas Planning and Development fee schedule lists a minor plat at $2,895 when no lot exceeds 3 acres in single-family, duplex or townhouse districts ($3,364 if a lot exceeds 3 acres), plus an $840 minor plat final fee. A major preliminary plat with fewer than 20 lots and no lot over 3 acres is $3,963, and the matching major final plat is $6,238. The city says these figures are informational and final fees are calculated at submittal. Survey, engineering and county filing are separate.

What are land subdivision costs in Austin?

Austin's FY 2026-27 Subdivision Plan Review fee schedule, effective October 1, 2026, lists Austin Development Services fees of $14,758.83 for a preliminary plan, $11,239.81 for a final plat with a preliminary, $11,106.01 for a final plat without a preliminary, and $6,782.57 for an infill plat. A completeness check is $1,176.67. Transportation, Water, Parks, Fire and Energy fees may also apply, depending on the project. The official fee page and the Subdivision Plan Review PDF have the full table.

What are land subdivision costs in San Antonio?

San Antonio's FY 2027 Development Fee Schedule lists a major single-family plat at $718.75 plus $92 per lot, and a minor plat of 0 to 3 acres at $684.25 plus $92 per lot (higher acreage bands cost more). There is a $287.50 subdivision filing fee, and unless a line is marked otherwise the schedule adds 4 percent technological and 4 percent development services surcharges. Recordation fees are listed separately.

What is a subdivision cost, or what do subdivision costs include?

Subdivision costs include the local application or plat fee, a licensed surveyor's plat, engineering if the split needs a street, drainage or utility lines, septic soil work where there is no public sewer, and the county recording fee. Application fees alone are not the total cost.

Is it cheaper to sell land without subdividing?

Often yes for the seller. A direct buyer can buy the whole parcel as-is. See selling land as-is.

Can I sell one piece without a full subdivision?

Sometimes, through a lot-line adjustment or similar process. Details are on sell part of your land.

What is the cheapest place to subdivide land in your table?

Huntsville, Alabama, where a 10-lot major subdivision costs $100 plus $5 per lot, or $150 in posted fees.

Why is Rutherford County so much higher?

Rutherford County charges $8,500 each for the preliminary plan and final plat, plus $1,600 per lot for plan review, land disturbance and inspection.

Are survey and engineering included in subdivision fees?

No. Those are private costs you pay to a surveyor or engineer, and they are usually larger than the government fees.

Do I need approval to split land into two parcels?

Usually yes, through a minor subdivision. Some places exempt larger parcels, such as Limestone County splits over two acres that meet frontage rules.

Can a buyer handle the subdivision instead?

Yes. Many buyers, including Liberty Acres, buy land as it is and do the platting work after closing.

What is the price to subdivide land into two lots?

There is no national price. A two-lot split is usually a minor subdivision or lot split, so you pay the local minor plat or lot split fee, plus the surveyor's plat, any septic soil work and the recording fee. Check your county or city fee schedule before you file.

What do land subdivision costs include?

The local application or plat fee, a licensed surveyor's plat, engineering if the split needs a street, drainage or utility lines, septic soil work where there is no public sewer, and the county recording fee.